Ensure Uninterrupted And Safe Power Plant Operations With Plant Consultation
The power generation plants install and use various equipment on an ongoing basis. Such equipment is subject to wear and tear for many reasons, resulting in sudden or gradual breakdown or risks. The outages in such equipment or systems may erode productivity. Therefore, the plant supervisors get them regularly inspected to ensure their functionality and prevent risk. HRSG, CCGT, and other support systems are standard equipment used in power and heat generation.
HRSG
A Heat Recovery Steam Generator (HRSG) is essential plant equipment in a gas turbine, enhancing thermal efficiency and allowing fewer CO2 emissions. It captures heat from the exhaust gasses and produces steam that the operators use to generate electricity or drive a steam turbine. HRSG comprises an economizer, evaporator, super heater, and water preheater. Its steam and water pressure components are subject to slow deformation, thermal, mechanical, and creep fatigue, and corrosion. It affects the functionality of HRSG, causing outages.
The engineers, water scientists, and technicians assess the conditions of each component and provide recommendations for immediate repair, focused testing, and inspection strategies. Onsite HRSG lab testing training enables employees to test the samples. Based on the results, the professionals identify cycle chemistry problems onsite and suggest required specific treatment programs besides repairs, replacements, and inspections.
CCGT, CIP, and PRC Compliance
A regulatory authority, North American Electric Reliability Corporation, also works with electricity suppliers to ensure reliable and secure grids with mitigation of risks. It conducts compliance audits for registered entities and bulk power systems to ensure quality, consistency, and credibility. It has issued reliability standards for Generator Owners (GO) and Generator Operators (GOP) against which the concerned entities check their bulk power systems, including CCGT (combined cycle gas turbine). The corporations engaged in natural gas-fired power generation must ensure compliance with standards for CCGT, Critical Infrastructure Protection (CIP), and Power Reserve Control (PRC) as specified by NERC.
Some generator owners and operators find NERC compliance complex and time-consuming, requiring expert guidance and assistance to follow the same and prepare reports. They opt for onsite professional consultation and NERC GOP reporting remotely by CCGT, CIP & PRC compliance consultants. The professionals help them with NERC compliance by performing audits, preparing reports, and carrying out supportive tasks.
The Bottom Line
NERC compliance comprises gap analysis concerning cyber security, Onsite and remote GO/GOP reporting, GADS reporting, and facility-specific procedures. The regulatory authority requires onsite visits besides NERC GOP reporting remotely by CCGT, CIP & PRC compliance consultants. Therefore, the power corporations must accommodate the onsite visits of the consultants and remote reporting as part of the procedure.